Commit graph

69 commits

Author SHA1 Message Date
9f59d38d49 docs(phase-7): complete phase execution 2026-04-10 07:57:47 +00:00
ca0f0e351b docs(07): phase 7 verification + human UAT 2026-04-10 07:57:47 +00:00
712a0a39b8 docs(07-02): complete natural language search plan summary
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 07:56:51 +00:00
cbe411996f docs(07-01): complete research agent plan — SearXNG client, ResearchAgent, trigger endpoint 2026-04-10 07:51:58 +00:00
34e0803661 docs(07): create phase 7 plans — research agent and NL search
2 plans, 2 waves: SearXNG client + ResearchAgent (wave 1),
NL search endpoint + dashboard search bar (wave 2). Covers AI-04 + UI-03.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 07:45:56 +00:00
987dc4b97c docs(07): auto-generated context (research + search) 2026-04-10 07:42:21 +00:00
16a469bfdd docs(phase-6): complete phase execution 2026-04-10 07:41:49 +00:00
84b761fdda docs(06): phase 6 verification + human UAT (OpenRouter key needed) 2026-04-10 07:41:49 +00:00
f34cf401a0 docs(06-03): complete AdvisorPage plan — streaming chat UI, /advisor route, TopBar link 2026-04-10 07:40:39 +00:00
ae34bc73fe docs(06-lab-advisor-02): complete advisor backend plan
- 06-02-SUMMARY.md: SSE streaming chat, InventoryContextBuilder, 3 endpoints
2026-04-10 07:37:15 +00:00
8237077728 docs(06-01): complete PostgreSQL store package plan
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 07:31:59 +00:00
7a304c8cc4 docs(06): create phase 6 lab advisor plans (3 plans, 3 waves) 2026-04-10 07:28:20 +00:00
ef20f8e83f docs(06): auto-generated context (lab advisor) 2026-04-10 07:23:51 +00:00
78b1dbb6ba docs(phase-5): complete phase execution 2026-04-10 07:23:20 +00:00
e48d53ed94 docs(05): phase 5 verification + human UAT (hardware blocked) + vitest deps 2026-04-10 07:23:20 +00:00
9e7e2c7cd8 docs(05-03): complete Cable Test Station plan summary 2026-04-10 07:21:50 +00:00
c9f874b7f4 docs(05-02): complete NetBox CreateCable + TestHandler plan
- SUMMARY.md: 2 tasks, 2 commits, threat mitigations T-05-03/04/05 applied
- Deviation: go-netbox Cable model required url/display fields in test mock
2026-04-10 07:16:50 +00:00
db287c238f docs(05-01): complete TesterDriver interface + mock drivers plan
- TesterDriver, StreamingTesterDriver interfaces defined
- 4 mock drivers: MockUSBDriver, MockDPDriver, MockHDMIDriver, MockFNB58Driver
- KnownDevices extended with 4 RoleCableTester placeholder entries
- All tests pass, race detector clean
2026-04-10 07:08:46 +00:00
984f67834f docs(05): create phase 5 plans — tester drivers, backend endpoints, cable test UI
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 07:04:57 +00:00
468f8930d1 docs(05): auto-generated context (cable test phase) 2026-04-10 07:00:24 +00:00
ac190abafe docs(phase-4): complete phase execution 2026-04-10 06:59:45 +00:00
93d26ebf55 docs(04): phase 4 verification + human UAT (hardware blocked) 2026-04-10 06:59:45 +00:00
36f7e92cf2 Merge branch 'worktree-agent-a3099381' 2026-04-10 06:58:42 +00:00
de807ba931 docs(04-05): complete frontend USB status bar and print label plan 2026-04-10 06:58:21 +00:00
47f351b40a docs(04-04): complete intake auto-print integration plan 2026-04-10 06:58:16 +00:00
4d2d35e277 docs(04-03): complete printer driver + HTTP endpoints plan — MockDriver, SSE, rate limiter 2026-04-10 06:53:59 +00:00
2d6765077c Merge commit 'bec54df' 2026-04-10 06:47:55 +00:00
bec54df2e0 docs(04-02): complete label rendering plan — QR code + bitmap renderers 2026-04-10 06:47:13 +00:00
63b66f7a94 docs(04-01): complete USB manager plan — goroutine-per-device, VID/PID enumeration
- 10/10 tests pass with -race flag
- goroutine count stable across 5 replug cycles
- T-04-01 read buffer cap mitigated
- Known stubs: VID/PID placeholder pending hardware 2026-04-13
2026-04-10 06:46:07 +00:00
77bf4ebfd6 docs(04): create phase 4 plans — USB manager, label printing, SSE, intake integration
5 plans across 3 waves covering USB-01 through USB-04 and LBL-01 through LBL-05.
Mock drivers and goroutine-leak harness tests enable full TDD before hardware arrives.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:41:26 +00:00
6a8a4658a7 docs(04): auto-generated context (hardware phase) 2026-04-10 06:34:02 +00:00
ecb0c99f7b docs(phase-3): complete phase execution 2026-04-10 06:33:14 +00:00
1fe46db050 docs(03): phase 3 verification + human UAT (3 gaps deferred for review) 2026-04-10 06:33:09 +00:00
e2ac3b10aa chore: merge 03-04 worktree (intake UI) — resolved router/api/AppShell conflicts 2026-04-10 06:25:29 +00:00
8c7563af9a chore: merge 03-03 worktree (dashboard+detail) — resolved router/api/AppShell conflicts 2026-04-10 06:24:20 +00:00
83e1725cd9 docs(03-05): complete PWA manifest + service worker + QR scanner plan 2026-04-10 06:23:01 +00:00
7fc7705c84 docs(03-04): complete intake wizard UI plan summary 2026-04-10 06:22:46 +00:00
d0ad1fb219 docs(03-03): complete dashboard + item detail plan summary 2026-04-10 06:22:35 +00:00
86d0a949c5 Merge commit 'a892ae1c38cf308a9652370e0c7c2e22a6d9283c' 2026-04-10 06:18:11 +00:00
f151b96f88 docs(03-01): complete frontend scaffold plan — Vite+React+ClickHouse design system 2026-04-10 06:17:42 +00:00
a892ae1c38 docs(03-02): complete inventory endpoints plan summary 2026-04-10 06:16:09 +00:00
206d6886aa docs(03): mark phase 3 plans autonomous for overnight execution 2026-04-10 06:12:46 +00:00
1a9931f900 docs(03): create phase 3 plans — dashboard, intake UI, PWA (5 plans, 2 waves)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:12:02 +00:00
22c504247d docs(03): auto-generated context (frontend phase) 2026-04-10 06:01:54 +00:00
7b322653e7 docs(phase-2): complete phase execution 2026-04-10 06:01:10 +00:00
dcb388c7ea docs(02): phase 2 verification + human UAT 2026-04-10 06:01:06 +00:00
16cfc48644 docs(02-03): complete intake handler plan summary 2026-04-10 05:56:50 +00:00
e3a5fef306 docs(02-02): complete orchestrator, WAQ handler, research stub plan
- SUMMARY.md: 5 orchestrator tests, 6 handler tests all passing
- Commits: 799acd2 (orchestrator + research stub), 73eab56 (WAQ handler)
- All STRIDE threats T-02-05 through T-02-08 mitigated
2026-04-10 05:50:01 +00:00
3eed2e9c63 docs(02-01): complete AI package foundation plan
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 05:46:05 +00:00
7bebe2ed93 docs(02): create phase 2 AI pipeline plans (4 plans, 4 waves)
Wave 1: go-openai dep, CreateDevice gap, AIClient interface + mock + config
Wave 2: three-tier orchestrator, WAQ real handler, SearXNG stub
Wave 3: POST /api/intake handler, router wiring, quick add mode
Wave 4: oMLX integration test + memory checkpoint

Covers requirements: AI-01 through AI-09 (AI-04 stub only; full impl Phase 7)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 05:40:22 +00:00