Author SHA1 Message Date
77bf4ebfd6 docs(04): create phase 4 plans — USB manager, label printing, SSE, intake integration
5 plans across 3 waves covering USB-01 through USB-04 and LBL-01 through LBL-05.
Mock drivers and goroutine-leak harness tests enable full TDD before hardware arrives.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:41:26 +00:00
ecb0c99f7b docs(phase-3): complete phase execution 2026-04-10 06:33:14 +00:00
1fe46db050 docs(03): phase 3 verification + human UAT (3 gaps deferred for review) 2026-04-10 06:33:09 +00:00
1a9931f900 docs(03): create phase 3 plans — dashboard, intake UI, PWA (5 plans, 2 waves)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:12:02 +00:00
7b322653e7 docs(phase-2): complete phase execution 2026-04-10 06:01:10 +00:00
dcb388c7ea docs(02): phase 2 verification + human UAT 2026-04-10 06:01:06 +00:00
7bebe2ed93 docs(02): create phase 2 AI pipeline plans (4 plans, 4 waves)
Wave 1: go-openai dep, CreateDevice gap, AIClient interface + mock + config
Wave 2: three-tier orchestrator, WAQ real handler, SearXNG stub
Wave 3: POST /api/intake handler, router wiring, quick add mode
Wave 4: oMLX integration test + memory checkpoint

Covers requirements: AI-01 through AI-09 (AI-04 stub only; full impl Phase 7)

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 05:40:22 +00:00
8d8026c110 docs(phase-1): complete phase execution 2026-04-10 05:27:36 +00:00
b4fc5c5f08 test(01): persist human verification items as UAT 2026-04-10 05:27:29 +00:00
c9ad50fdf2 docs(01-foundation): create phase 1 plans (5 plans, 2 waves)
Plans 01-02 are Wave 1 (parallel). Plans 03-04-05 are Wave 2.
All 11 requirements covered: INF-01, INF-02, INF-03, NB-01 through NB-07.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 01:07:55 +00:00
1a51cbc323 docs: create roadmap (7 phases) 2026-04-10 00:04:27 +00:00