db287c238f
docs(05-01): complete TesterDriver interface + mock drivers plan
...
- TesterDriver, StreamingTesterDriver interfaces defined
- 4 mock drivers: MockUSBDriver, MockDPDriver, MockHDMIDriver, MockFNB58Driver
- KnownDevices extended with 4 RoleCableTester placeholder entries
- All tests pass, race detector clean
2026-04-10 07:08:46 +00:00
984f67834f
docs(05): create phase 5 plans — tester drivers, backend endpoints, cable test UI
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 07:04:57 +00:00
468f8930d1
docs(05): auto-generated context (cable test phase)
2026-04-10 07:00:24 +00:00
ac190abafe
docs(phase-4): complete phase execution
2026-04-10 06:59:45 +00:00
93d26ebf55
docs(04): phase 4 verification + human UAT (hardware blocked)
2026-04-10 06:59:45 +00:00
36f7e92cf2
Merge branch 'worktree-agent-a3099381'
2026-04-10 06:58:42 +00:00
de807ba931
docs(04-05): complete frontend USB status bar and print label plan
2026-04-10 06:58:21 +00:00
47f351b40a
docs(04-04): complete intake auto-print integration plan
2026-04-10 06:58:16 +00:00
4d2d35e277
docs(04-03): complete printer driver + HTTP endpoints plan — MockDriver, SSE, rate limiter
2026-04-10 06:53:59 +00:00
2d6765077c
Merge commit 'bec54df'
2026-04-10 06:47:55 +00:00
bec54df2e0
docs(04-02): complete label rendering plan — QR code + bitmap renderers
2026-04-10 06:47:13 +00:00
63b66f7a94
docs(04-01): complete USB manager plan — goroutine-per-device, VID/PID enumeration
...
- 10/10 tests pass with -race flag
- goroutine count stable across 5 replug cycles
- T-04-01 read buffer cap mitigated
- Known stubs: VID/PID placeholder pending hardware 2026-04-13
2026-04-10 06:46:07 +00:00
77bf4ebfd6
docs(04): create phase 4 plans — USB manager, label printing, SSE, intake integration
...
5 plans across 3 waves covering USB-01 through USB-04 and LBL-01 through LBL-05.
Mock drivers and goroutine-leak harness tests enable full TDD before hardware arrives.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:41:26 +00:00
6a8a4658a7
docs(04): auto-generated context (hardware phase)
2026-04-10 06:34:02 +00:00
ecb0c99f7b
docs(phase-3): complete phase execution
2026-04-10 06:33:14 +00:00
1fe46db050
docs(03): phase 3 verification + human UAT (3 gaps deferred for review)
2026-04-10 06:33:09 +00:00
e2ac3b10aa
chore: merge 03-04 worktree (intake UI) — resolved router/api/AppShell conflicts
2026-04-10 06:25:29 +00:00
8c7563af9a
chore: merge 03-03 worktree (dashboard+detail) — resolved router/api/AppShell conflicts
2026-04-10 06:24:20 +00:00
83e1725cd9
docs(03-05): complete PWA manifest + service worker + QR scanner plan
2026-04-10 06:23:01 +00:00
7fc7705c84
docs(03-04): complete intake wizard UI plan summary
2026-04-10 06:22:46 +00:00
d0ad1fb219
docs(03-03): complete dashboard + item detail plan summary
2026-04-10 06:22:35 +00:00
86d0a949c5
Merge commit 'a892ae1c38cf308a9652370e0c7c2e22a6d9283c'
2026-04-10 06:18:11 +00:00
f151b96f88
docs(03-01): complete frontend scaffold plan — Vite+React+ClickHouse design system
2026-04-10 06:17:42 +00:00
a892ae1c38
docs(03-02): complete inventory endpoints plan summary
2026-04-10 06:16:09 +00:00
206d6886aa
docs(03): mark phase 3 plans autonomous for overnight execution
2026-04-10 06:12:46 +00:00
1a9931f900
docs(03): create phase 3 plans — dashboard, intake UI, PWA (5 plans, 2 waves)
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 06:12:02 +00:00
22c504247d
docs(03): auto-generated context (frontend phase)
2026-04-10 06:01:54 +00:00
7b322653e7
docs(phase-2): complete phase execution
2026-04-10 06:01:10 +00:00
dcb388c7ea
docs(02): phase 2 verification + human UAT
2026-04-10 06:01:06 +00:00
16cfc48644
docs(02-03): complete intake handler plan summary
2026-04-10 05:56:50 +00:00
e3a5fef306
docs(02-02): complete orchestrator, WAQ handler, research stub plan
...
- SUMMARY.md: 5 orchestrator tests, 6 handler tests all passing
- Commits: 799acd2 (orchestrator + research stub), 73eab56 (WAQ handler)
- All STRIDE threats T-02-05 through T-02-08 mitigated
2026-04-10 05:50:01 +00:00
3eed2e9c63
docs(02-01): complete AI package foundation plan
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 05:46:05 +00:00
7bebe2ed93
docs(02): create phase 2 AI pipeline plans (4 plans, 4 waves)
...
Wave 1: go-openai dep, CreateDevice gap, AIClient interface + mock + config
Wave 2: three-tier orchestrator, WAQ real handler, SearXNG stub
Wave 3: POST /api/intake handler, router wiring, quick add mode
Wave 4: oMLX integration test + memory checkpoint
Covers requirements: AI-01 through AI-09 (AI-04 stub only; full impl Phase 7)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 05:40:22 +00:00
6460b27bfc
docs(02): research AI pipeline phase — go-openai vision, mock interface, orchestrator patterns
2026-04-10 05:32:17 +00:00
5313dfb501
docs(02): auto-generated context (autonomous mode)
2026-04-10 05:28:22 +00:00
8d8026c110
docs(phase-1): complete phase execution
2026-04-10 05:27:36 +00:00
b4fc5c5f08
test(01): persist human verification items as UAT
2026-04-10 05:27:29 +00:00
28e2f5a879
Merge branch 'worktree-agent-a86e8ac9'
2026-04-10 05:23:48 +00:00
1707496027
docs(01-04): complete HW-ID, quality gate, tag sync plan
...
- SUMMARY.md: 8 files created, 16 unit tests pass, 3 integration skipped
- normalizeTags deviation documented (slug dedup fix)
- T-04-01/T-04-02 mitigations confirmed in catalog_updater and tags
2026-04-10 05:23:13 +00:00
8f902edcd7
docs(01-05): complete DragonFlyDB write-ahead queue plan summary
...
- Integration tests ran and passed against DragonFlyDB at 10.5.0.10:6379
- Documents custom URL parser deviation for slash-in-password fix
- Notes NoOpHandler stub for Phase 2 replacement
2026-04-10 05:22:54 +00:00
52e3e9cd9c
docs(01-03): complete NetBox provisioning plan summary
2026-04-10 05:22:44 +00:00
f15c0c7ea7
docs(01-02): complete NetBox client plan summary
...
- SUMMARY.md for plan 01-02 with go-netbox v4 API notes and deviation log
2026-04-10 05:18:13 +00:00
b1e4db0b6d
docs(01): fix plan checker blockers (research resolution, catalog updater)
2026-04-10 01:11:41 +00:00
c9ad50fdf2
docs(01-foundation): create phase 1 plans (5 plans, 2 waves)
...
Plans 01-02 are Wave 1 (parallel). Plans 03-04-05 are Wave 2.
All 11 requirements covered: INF-01, INF-02, INF-03, NB-01 through NB-07.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 01:07:55 +00:00
73eec3ee76
docs(phase-1): add validation strategy
2026-04-10 00:58:10 +00:00
104663dd19
docs(phase-1): research foundation phase — Go scaffold, NetBox, DragonFlyDB WAQ
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 00:57:19 +00:00
477624dcd3
docs(01): auto-generated context (infrastructure phase)
2026-04-10 00:49:04 +00:00
1a51cbc323
docs: create roadmap (7 phases)
2026-04-10 00:04:27 +00:00
f7e5e72686
docs: define v1 requirements
2026-04-10 00:01:35 +00:00
5d7c5e90a2
docs: complete project research
2026-04-09 23:35:26 +00:00