plan: 02-04
phase: 02-ai-pipeline
status: deferred
started: 2026-04-10
completed: 2026-04-10
---
# Plan 02-04 Summary: oMLX Integration (Deferred)
## Outcome
**Deferred to human verification** — this plan requires:
1. oMLX installed on Mac Mini M4 with Gemma 4 model loaded
2. Live memory measurement during inference
3. Real photo upload through the intake endpoint
The user explicitly deferred manual verification to morning review. This plan is tracked in HUMAN-UAT.md for the phase.
## Tasks
| # | Task | Status |
|---|------|--------|
| 1 | oMLX integration test scaffold | skipped (requires hardware) |
| 2 | Memory budget measurement | skipped (requires hardware) |
## Next Steps (Human Action)
1. Install oMLX on Mac Mini M4
2. Pull Gemma 4 E4B model
3. Run `go test ./internal/ai/... -run TestOMLXIntegration -tags=integration`
4. Document peak memory usage in docs/omlx-setup.md
## Self-Check: DEFERRED (pending hardware setup)