docs(01-01): complete project scaffolding plan
- Create 01-01-SUMMARY.md documenting plan execution - Update STATE.md with current position and velocity metrics - Update ROADMAP.md progress table Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
This commit is contained in:
parent
44e23226b1
commit
3e90f9cf21
3 changed files with 132 additions and 12 deletions
|
|
@ -68,7 +68,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5 → 6
|
||||||
|
|
||||||
| Phase | Plans Complete | Status | Completed |
|
| Phase | Plans Complete | Status | Completed |
|
||||||
|-------|----------------|--------|-----------|
|
|-------|----------------|--------|-----------|
|
||||||
| 1. Foundation | 0/TBD | Not started | - |
|
| 1. Foundation | 1/TBD | In progress | - |
|
||||||
| 2. Bot Core | 0/TBD | Not started | - |
|
| 2. Bot Core | 0/TBD | Not started | - |
|
||||||
| 3. Project CRUD | 0/TBD | Not started | - |
|
| 3. Project CRUD | 0/TBD | Not started | - |
|
||||||
| 4. Single Model Q&A | 0/TBD | Not started | - |
|
| 4. Single Model Q&A | 0/TBD | Not started | - |
|
||||||
|
|
|
||||||
|
|
@ -10,28 +10,28 @@ See: .planning/PROJECT.md (updated 2026-01-16)
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 1 of 6 (Foundation)
|
Phase: 1 of 6 (Foundation)
|
||||||
Plan: Not started
|
Plan: 1 of TBD complete
|
||||||
Status: Ready to plan
|
Status: In progress
|
||||||
Last activity: 2026-01-16 — Project initialized
|
Last activity: 2026-01-16 — Completed 01-01-PLAN.md (project scaffolding)
|
||||||
|
|
||||||
Progress: ░░░░░░░░░░ 0%
|
Progress: █░░░░░░░░░ ~10%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 0
|
- Total plans completed: 1
|
||||||
- Average duration: —
|
- Average duration: 8 min
|
||||||
- Total execution time: 0 hours
|
- Total execution time: 0.13 hours
|
||||||
|
|
||||||
**By Phase:**
|
**By Phase:**
|
||||||
|
|
||||||
| Phase | Plans | Total | Avg/Plan |
|
| Phase | Plans | Total | Avg/Plan |
|
||||||
|-------|-------|-------|----------|
|
|-------|-------|-------|----------|
|
||||||
| — | — | — | — |
|
| 01-foundation | 1 | 8 min | 8 min |
|
||||||
|
|
||||||
**Recent Trend:**
|
**Recent Trend:**
|
||||||
- Last 5 plans: —
|
- Last 5 plans: 01-01 (8 min)
|
||||||
- Trend: —
|
- Trend: Starting
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
|
|
@ -40,7 +40,8 @@ Progress: ░░░░░░░░░░ 0%
|
||||||
Decisions are logged in PROJECT.md Key Decisions table.
|
Decisions are logged in PROJECT.md Key Decisions table.
|
||||||
Recent decisions affecting current work:
|
Recent decisions affecting current work:
|
||||||
|
|
||||||
(None yet)
|
- **01-01:** hatchling as build backend with explicit src layout config
|
||||||
|
- **01-01:** ruff-pre-commit v0.14.13 with --fix for auto-corrections
|
||||||
|
|
||||||
### Deferred Issues
|
### Deferred Issues
|
||||||
|
|
||||||
|
|
|
||||||
119
.planning/phases/01-foundation/01-01-SUMMARY.md
Normal file
119
.planning/phases/01-foundation/01-01-SUMMARY.md
Normal file
|
|
@ -0,0 +1,119 @@
|
||||||
|
---
|
||||||
|
phase: 01-foundation
|
||||||
|
plan: 01
|
||||||
|
subsystem: infra
|
||||||
|
tags: [python, ruff, pre-commit, hatchling, pytest]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires: []
|
||||||
|
provides:
|
||||||
|
- Python project structure with src layout
|
||||||
|
- pyproject.toml with hatchling build backend
|
||||||
|
- ruff linting and formatting configuration
|
||||||
|
- pre-commit hooks for code quality
|
||||||
|
- pytest configuration with async support
|
||||||
|
affects: [02-bot-core, all-future-phases]
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: [python-telegram-bot, sqlalchemy, httpx, aiosqlite, pytest, pytest-cov, pytest-asyncio, ruff, pre-commit, hatchling]
|
||||||
|
patterns: [src-layout, editable-install]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created:
|
||||||
|
- pyproject.toml
|
||||||
|
- .pre-commit-config.yaml
|
||||||
|
- src/moai/__init__.py
|
||||||
|
- src/moai/bot/__init__.py
|
||||||
|
- src/moai/bot/handlers/__init__.py
|
||||||
|
- src/moai/core/__init__.py
|
||||||
|
- tests/__init__.py
|
||||||
|
modified: []
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "hatchling as build backend (modern, works well with uv/pip)"
|
||||||
|
- "src layout with tool.hatch.build.targets.wheel.packages configuration"
|
||||||
|
- "ruff-pre-commit v0.14.13 with --fix flag for auto-corrections"
|
||||||
|
- "pre-commit-hooks v5.0.0 for standard file hygiene"
|
||||||
|
|
||||||
|
patterns-established:
|
||||||
|
- "src layout: all source code under src/moai/"
|
||||||
|
- "Module docstrings: required on all __init__.py files"
|
||||||
|
- "Version in __init__.py: moai.__version__ for programmatic access"
|
||||||
|
|
||||||
|
issues-created: []
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 8min
|
||||||
|
completed: 2026-01-16
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 1, Plan 1: Project Scaffolding Summary
|
||||||
|
|
||||||
|
**Python project scaffolding with pyproject.toml (hatchling), ruff linting, pre-commit hooks, and src layout structure**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 8 min
|
||||||
|
- **Started:** 2026-01-16T15:00:00Z
|
||||||
|
- **Completed:** 2026-01-16T15:08:00Z
|
||||||
|
- **Tasks:** 3
|
||||||
|
- **Files created:** 7
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
- Created pyproject.toml with all dependencies and tool configurations
|
||||||
|
- Configured pre-commit with ruff linting/formatting and standard hygiene hooks
|
||||||
|
- Established src layout package structure matching SPEC.md architecture
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
Each task was committed atomically:
|
||||||
|
|
||||||
|
1. **Task 1: Create pyproject.toml** - `39b1781` (build)
|
||||||
|
2. **Task 2: Create pre-commit configuration** - `5856e6b` (chore)
|
||||||
|
3. **Task 3: Create src layout and package structure** - `44e2322` (feat)
|
||||||
|
|
||||||
|
**Plan metadata:** (pending)
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
- `pyproject.toml` - Project metadata, dependencies, ruff/pytest config
|
||||||
|
- `.pre-commit-config.yaml` - Pre-commit hooks configuration
|
||||||
|
- `src/moai/__init__.py` - Package root with __version__
|
||||||
|
- `src/moai/bot/__init__.py` - Bot subpackage marker
|
||||||
|
- `src/moai/bot/handlers/__init__.py` - Handlers subpackage marker
|
||||||
|
- `src/moai/core/__init__.py` - Core subpackage marker
|
||||||
|
- `tests/__init__.py` - Test package marker
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
- Used hatchling with explicit `packages = ["src/moai"]` for src layout (required for editable install)
|
||||||
|
- Selected ruff-pre-commit v0.14.13 (latest stable as of 2026-01-16)
|
||||||
|
- Used pre-commit-hooks v5.0.0 for standard hooks
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
### Auto-fixed Issues
|
||||||
|
|
||||||
|
**1. [Rule 3 - Blocking] Added hatch build configuration for src layout**
|
||||||
|
- **Found during:** Task 1 (pyproject.toml creation)
|
||||||
|
- **Issue:** Hatchling couldn't find package without explicit src layout config
|
||||||
|
- **Fix:** Added `[tool.hatch.build.targets.wheel] packages = ["src/moai"]`
|
||||||
|
- **Files modified:** pyproject.toml
|
||||||
|
- **Verification:** pip install -e ".[dev]" succeeds
|
||||||
|
- **Committed in:** 39b1781 (Task 1 commit)
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
**Total deviations:** 1 auto-fixed (blocking issue), 0 deferred
|
||||||
|
**Impact on plan:** Auto-fix was necessary for hatchling to work with src layout. No scope creep.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
None - all tasks completed successfully after the hatchling configuration fix.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
- Project scaffolding complete, ready for Phase 1 Plan 2 (database models)
|
||||||
|
- All tooling in place: ruff, pre-commit, pytest
|
||||||
|
- Package importable and version accessible
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 01-foundation*
|
||||||
|
*Completed: 2026-01-16*
|
||||||