Commit graph

3 commits

Author SHA1 Message Date
Nexus Dev
3f0d3377e7 docs(nexus): wave 2 implementation plans (phases 9, 10, 11)
Three phase plans for Wave 2 of the Nexus layout overhaul. Each plan
is self-contained with ownership boundaries, scope fence, file inventory,
implementation notes, acceptance criteria, and commit scheme — designed
for parallel subagent dispatch per MIGRATION-PLAN.md section 11.

Phase 9 (Assistant mode):
  - Full-bleed chat at /assistant, no inner conversation list
  - History slide-over (left) + Memory slide-over (right)
  - Conversational home-state greeting replaces Dashboard
  - ActionStrip with Promote/Attach/Memory/History
  - New components: AssistantInputBar, ActionStrip, HistorySheet,
    MemorySheet, AssistantHomeGreeting + useAssistantHomeStatus hook
  - Owns: PersonalAssistant.tsx + components/assistant/**

Phase 10 (Studio mode):
  - 8-card workshop grid replaces 7-tab ContentStudio
  - ConvertPage folds in as 8th workshop (legacy /convert route kept)
  - StudioPromptBar freeform input with keyword-based classifier
  - Two-column workshop detail view (params left, preview right)
  - Owns: ContentStudio.tsx + pages/StudioWorkshopDetail.tsx
    + components/studio/**

Phase 11 (Projects + Builder mode):
  - ProjectCard with 72px Inter Black volt hero percentage
  - 7-tab BuilderTabStrip (Overview/Issues/Agents/Gates/Costs/Activity/Org)
  - Approvals -> Gates display-only rename
  - OverviewTab with milestone checklist, origin chat card, activity
  - Thin per-project wrappers reuse existing list components scoped
    by projectId (escalate if not supported)
  - useGateIndicator hook for the future Assistant dot notification
  - Owns: Projects.tsx + ProjectDetail.tsx + components/projects/**

Ownership boundaries prevent parallel-dispatch file conflicts:
- App.tsx routing changes are controller-owned (post-Wave wiring)
- Each phase declares its file ownership and must not cross into others
- Existing list components reused as-is; escalate if not scope-compatible
- IconRail dot wiring for phase 11's gate indicator deferred to
  post-Wave controller step

Dispatch pattern: three general-purpose subagents dispatched in parallel,
each handed the full plan text + the spec + ownership rules. Each
subagent implements its phase end-to-end with atomic commits per
logical unit. Controller reviews outputs after all three complete.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-11 12:09:34 +00:00
Nexus Dev
2a42f4ab86 docs(nexus): phase 8 frame skeleton implementation plan
Task-by-task implementation plan for Phase 8 of the Nexus layout
overhaul (docs/specs/2026-04-11-nexus-layout-overhaul.md §13).

Seven tasks:
  1. IconRail component + test
  2. ModeBreadcrumb component + test
  3. CmdKButton shim component + test
  4. GlobalMicButton scaffold + test
  5. TopStrip composite + test
  6. Layout.tsx rewrite (mount new frame, kill old chrome)
  7. Manual smoke test

TDD throughout (write failing test, run, implement, run, commit).
One commit per task. Execution via subagent-driven-development with
fresh subagent per task and two-stage review.

The plan includes complete code for every task (no placeholders),
exact file paths, exact test patterns matching the existing vitest
manual-createRoot pattern from ChatInput.test.tsx, and wire-up
details for preserving Layout.tsx's non-chrome responsibilities
(company-prefix URL sync, first-run onboarding, body overflow,
instance settings memory, dialog overlays).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-11 10:45:30 +00:00
Dotta
45998aa9a0 feat(issues): add issue documents and inline editing
Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-03-13 21:30:48 -05:00