--- gsd_state_version: 1.0 milestone: v1.6 milestone_name: Voice Pipeline + Minimal Message Bridge status: planning stopped_at: null last_updated: "2026-04-03" last_activity: 2026-04-03 progress: total_phases: 4 completed_phases: 0 total_plans: 0 completed_plans: 0 percent: 0 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-04-03) **Core value:** A fresh onboard asks for ONE thing (root directory), auto-creates PM + Engineer agents, and drops you in the dashboard. **Current focus:** Phase 36 — Voice Pipeline Foundation (ready to plan) ## Current Position Phase: 36 of 39 (Voice Pipeline Foundation) Plan: — (not started) Status: Ready to plan Last activity: 2026-04-03 — v1.6 roadmap created (4 phases, 23 requirements mapped) Progress: [░░░░░░░░░░] 0% ## Performance Metrics **Velocity:** - Total plans completed: 0 (v1.6) - Average duration: - - Total execution time: 0 hours ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Key constraints for v1.6: - voicePipelineService is the keystone — Phase 37 and Phase 38 both depend on it; build Phase 36 first - Telegram bridge uses long polling (grammY `bot.start()`) — no public HTTPS required on Mac Mini - Audio transcoding via ffmpeg-static ^5.2.0 — NOT archived fluent-ffmpeg (archived May 2025) - Voice mode flag must survive every pipeline layer: client → Express → message persistence → agent codec - COOP/COEP headers required for @ricky0123/vad-react SharedArrayBuffer (add to Express static middleware) - Phase 37 and Phase 38 are independent once Phase 36 ships; sequential ordering for single-developer delivery - Telegram bridge must stay under 500 lines (TGRAM-06 is a hard constraint) ### Pending Todos None yet. ### Blockers/Concerns - [v1.5 carryover] smart-whisper Apple Silicon acceleration unverified on Mac Mini M4 — fall back to `tiny.en` if `base.en` acceleration not confirmed - [v1.6] grammY session management approach not yet chosen: lightweight `Map` vs. grammY conversation plugin — decide at Phase 38 planning - [v1.6] Dual output prompt reliability on 7B models is ~90% — Approach B fallback (post-process markdown strip) must be implemented as safety net, not optional ## Session Continuity Last session: 2026-04-03 Stopped at: Roadmap created — 4 phases defined, 23/23 requirements mapped Resume file: None