--- gsd_state_version: 1.0 milestone: v1.7 milestone_name: Content Generation status: verifying stopped_at: Completed 40-02-PLAN.md — HTTP routes, app.ts mount, integration tests last_updated: "2026-04-04T12:50:26.357Z" last_activity: 2026-04-04 progress: total_phases: 6 completed_phases: 1 total_plans: 2 completed_plans: 2 percent: 0 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-04-04) **Core value:** A fresh onboard asks for ONE thing (root directory), auto-creates PM + Engineer agents, and drops you in the dashboard. **Current focus:** Phase 40 — job-infrastructure ## Current Position Phase: 41 Plan: Not started Status: Phase complete — ready for verification Last activity: 2026-04-04 Progress: [░░░░░░░░░░] 0% ## Performance Metrics **Velocity:** - Total plans completed: 0 (v1.7) - Average duration: - - Total execution time: 0 hours ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Key constraints for v1.7: - content_jobs table + renderPipelineService stub must exist before any renderer is built — Phase 40 is the hard dependency for all other phases - Async job pattern is mandatory — all render requests return 202 + job ID immediately; never block HTTP on render - sourceTaskId is required on every generated asset from day one (prevents SSD orphan accumulation) - MAX_GENERATED_ASSET_BYTES constant bypasses the 10MB upload limit for generated/namespace — separate from upload route - Mermaid securityLevel must be "strict" — strip %%{init}%% and click directives before render, DOMPurify on SVG output - OKLCH via culori for all theme generation — HSL is forbidden as an intermediate (perceptually non-uniform) - Remotion bundle() called once at startup, not per-render — cached bundle path passed to renderMedia() per request - Remotion isolated in packages/content-renderer/ workspace package — webpack bundler must not enter Vite/tsc server context - Phase 42 and Phase 41 both depend on Phase 40 but are independent of each other (can parallelize if needed) - Phase 43 (PDF/Brand) depends on Phase 41 because PDF templates may reuse satori/SVG pipeline components - Phase 44 (Remotion) depends only on Phase 40 (job infra) — can start after Phase 40, independent of 41-43 - Phase 45 (Skills) is last — skill markdown files reference API contracts finalized in Phases 41-44 - AI-bridged conversion (CONV-05) is the fallback for all format pairs — never show a format pair as blocked - CONV-08: converter availability detected at startup via probe; unavailable direct paths fall to AI bridge - CONV-09: magic-byte MIME validation before processing — reject misnamed files with a clear error - [Phase 40]: content_jobs uses no FK for resultAssetId or sourceTaskId — avoids circular FK, tasks are string IDs not UUIDs - [Phase 40]: renderContent is a stub in Phase 40 — phases 41-45 add real renderers keyed by jobType - [Phase 40]: SSE uses EventEmitter subscription not polling for content_job.* events ### Pending Todos None yet. ### Blockers/Concerns - [v1.7 pre-start] Verify correct resvg package name: `@resvg/resvg-js` (v2.6.2) vs `resvg-js` (v0.1.97) — run `npm info @resvg/resvg-js` before pnpm add in Phase 41 - [v1.7 pre-start] Check whether playwright-chromium and @mermaid-js/mermaid-cli can share a Chromium binary via PUPPETEER_EXECUTABLE_PATH — could save ~300MB on Mac Mini SSD - [v1.7 pre-start] Run pnpm build after adding packages/content-renderer/ to verify no Vite/webpack conflicts before Phase 44 implementation - [v1.7 pre-start] Confirm pdf-lib scope: Playwright for design-rich PDFs, pdf-lib for data-driven invoices — decide at Phase 43 planning ## Session Continuity Last session: 2026-04-04T12:45:05.515Z Stopped at: Completed 40-02-PLAN.md — HTTP routes, app.ts mount, integration tests Resume file: None