Tasks completed: 2/2 - Set up PostgreSQL with Docker and async session factory - Configure Alembic and create Build model SUMMARY: .planning/phases/01-core-infrastructure-security/01-02-SUMMARY.md
2 KiB
2 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-01-25)
Core value: Make Linux customization visual and accessible to people who aren't Linux experts Current focus: Phase 1 - Core Infrastructure & Security
Current Position
Phase: 1 of 9 (Core Infrastructure & Security) Plan: 2 of 5 in current phase Status: In progress Last activity: 2026-01-25 - Completed 01-02-PLAN.md
Progress: [██░░░░░░░░] 4%
Performance Metrics
Velocity:
- Total plans completed: 2
- Average duration: 4.5 min
- Total execution time: 9 min
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01 | 2 | 9 min | 4.5 min |
Recent Trend:
- Last 5 plans: 01-01 (3 min), 01-02 (6 min)
- Trend: N/A (not enough data)
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Roadmap]: 9-phase structure following research recommendations - infrastructure first, then backend systems, then user features, then polish
- [01-01]: Used hatchling as build backend for pyproject.toml
- [01-01]: Created root /health endpoint outside versioned API for simple health checks
- [01-02]: Port 5433 for PostgreSQL (5432 in use by another container)
- [01-02]: Connection pool settings from research: pool_size=10, max_overflow=20, pool_recycle=1800
Pending Todos
None yet.
Blockers/Concerns
Phase 1 readiness:
- Research suggests systemd-nspawn for build sandboxing - need to validate compatibility with archiso
- Deterministic builds require SOURCE_DATE_EPOCH and fixed locales - verify archiso supports these configurations
Phase 7 readiness:
- 3D visualization requires 60fps target on Intel UHD Graphics - may need early performance prototyping
Phase 8 readiness:
- SAT solver integration complexity is high - research phase recommended before planning
Session Continuity
Last session: 2026-01-25T20:12:01Z Stopped at: Completed 01-02-PLAN.md Resume file: None