Mikkel Georgsen 8be69688e9 docs(01-01): complete project scaffold + core infrastructure plan
- SUMMARY.md with full execution details, 2 task commits, 2 deviations
- STATE.md updated with position (Plan 2/14), decisions, metrics
- REQUIREMENTS.md: ARCH-01, ARCH-04, ARCH-05, ARCH-06, ARCH-07 marked complete

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-01 03:47:04 +01:00

3.1 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-02-28)

Core value: A venue can run a complete tournament offline on a €100 device with wireless displays and player mobile access — and it just works, on any network, with zero IT involvement. Current focus: Phase 1 — Foundation

Current Position

Phase: 1 of 7 (Tournament Engine) Plan: 2 of 14 in current phase Status: Executing Phase 1 Last activity: 2026-03-01 — Completed Plan A (Project Scaffold + Core Infrastructure) and Plan B (Database Schema + Migrations)

Progress: [█░░░░░░░░░] 14%

Performance Metrics

Velocity:

  • Total plans completed: 2
  • Average duration: 12min
  • Total execution time: 0.42 hours

By Phase:

Phase Plans Total Avg/Plan
01-tournament-engine 2 25min 12min

Recent Trend:

  • Last 5 plans: 01-01 (15min), 01-02 (10min)
  • Trend: starting

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Init]: Go monorepo, shared internal/, cmd/leaf and cmd/core are the only divergence points
  • [Init]: NATS sync_interval: always required before first deploy (December 2025 Jepsen finding)
  • [Init]: All monetary values int64 cents — never float64 (CI gate test required)
  • [Init]: go-libsql has no tagged releases — pin to commit hash in go.mod
  • [Init]: Netbird reverse proxy is beta — validate player PWA access in Phase 1 before depending on it in Phase 8
  • [01-01]: NATS server v2.12.4 requires Go 1.24+ — auto-upgraded from Go 1.23
  • [01-01]: WebSocket JWT via query parameter (browser WS API limitation)
  • [01-01]: JWT signing key ephemeral per startup — will persist in auth plan
  • [01-02]: go-libsql requires single-statement Exec — migration runner splits SQL files into individual statements
  • [01-02]: go-libsql PRAGMA handling is inconsistent — use QueryRow for journal_mode, execPragma helper for others
  • [01-02]: Force single DB connection during migrations (SetMaxOpenConns(1)) for table visibility

Pending Todos

None yet.

Blockers/Concerns

  • [Phase 1]: go-libsql CGO ARM64 cross-compilation must be validated in CI before any downstream features depend on it
  • [Phase 1]: Netbird reverse proxy beta status — test the full QR code → HTTPS → WireGuard → Leaf flow early
  • [Phase 3]: NATS JetStream cross-domain stream mirroring (Leaf → Core) needs integration test before Phase 2 depends on it
  • [Phase 4]: Events engine security — run_command sandboxing, webhook URL allowlist, WYSIWYG HTML sanitization (deferred from Phase 1 security review)
  • [Phase 7]: JWT HttpOnly cookies + signing key rotation (deferred from Phase 1 security review — localStorage is acceptable while Leaf is local-network only)
  • [Phase 7]: Pi Zero 2W memory must be profiled on actual hardware with all display views before scaling signage

Session Continuity

Last session: 2026-03-01 Stopped at: Completed 01-01-PLAN.md (Project Scaffold + Core Infrastructure) Resume file: None