14 plans in 6 waves covering all 68 requirements for the Tournament Engine phase. Includes research (go-libsql, NATS JetStream, Svelte 5 runes, ICM complexity), plan verification (2 iterations), and user feedback (hand-for-hand UX, SEAT-06 reword, re-entry semantics, integration test, DKK defaults, JWT 7-day expiry, clock tap safety). Wave structure: 1: A (scaffold), B (schema) 2: C (auth/audit), D (clock), E (templates), J (frontend scaffold) 3: F (financial), H (seating), M (layout shell) 4: G (player management) 5: I (tournament lifecycle) 6: K (overview/financials), L (players), N (tables/more) Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2.2 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-02-28)
Core value: A venue can run a complete tournament offline on a €100 device with wireless displays and player mobile access — and it just works, on any network, with zero IT involvement. Current focus: Phase 1 — Foundation
Current Position
Phase: 1 of 7 (Tournament Engine) Plan: 0 of 12 in current phase Status: Planning complete — ready to execute Last activity: 2026-03-01 — Phase 1 planned (12 plans, 5 waves, 68 requirements covered)
Progress: [░░░░░░░░░░] 0%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: -
- Total execution time: 0 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| - | - | - | - |
Recent Trend:
- Last 5 plans: none yet
- Trend: -
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Init]: Go monorepo, shared
internal/,cmd/leafandcmd/coreare the only divergence points - [Init]: NATS sync_interval: always required before first deploy (December 2025 Jepsen finding)
- [Init]: All monetary values int64 cents — never float64 (CI gate test required)
- [Init]: go-libsql has no tagged releases — pin to commit hash in go.mod
- [Init]: Netbird reverse proxy is beta — validate player PWA access in Phase 1 before depending on it in Phase 8
Pending Todos
None yet.
Blockers/Concerns
- [Phase 1]: go-libsql CGO ARM64 cross-compilation must be validated in CI before any downstream features depend on it
- [Phase 1]: Netbird reverse proxy beta status — test the full QR code → HTTPS → WireGuard → Leaf flow early
- [Phase 3]: NATS JetStream cross-domain stream mirroring (Leaf → Core) needs integration test before Phase 2 depends on it
- [Phase 7]: Pi Zero 2W memory must be profiled on actual hardware with all display views before scaling signage
Session Continuity
Last session: 2026-03-01 Stopped at: Phase 1 planning complete (12 plans, 5 waves) — ready to begin execution with Plan A (Wave 1) Resume file: None