Mikkel Georgsen 21ff95068e docs(01): create Phase 1 plans (A-N) with research and feedback
14 plans in 6 waves covering all 68 requirements for the Tournament
Engine phase. Includes research (go-libsql, NATS JetStream, Svelte 5
runes, ICM complexity), plan verification (2 iterations), and user
feedback (hand-for-hand UX, SEAT-06 reword, re-entry semantics,
integration test, DKK defaults, JWT 7-day expiry, clock tap safety).

Wave structure:
  1: A (scaffold), B (schema)
  2: C (auth/audit), D (clock), E (templates), J (frontend scaffold)
  3: F (financial), H (seating), M (layout shell)
  4: G (player management)
  5: I (tournament lifecycle)
  6: K (overview/financials), L (players), N (tables/more)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-01 02:58:22 +01:00

2.2 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-02-28)

Core value: A venue can run a complete tournament offline on a €100 device with wireless displays and player mobile access — and it just works, on any network, with zero IT involvement. Current focus: Phase 1 — Foundation

Current Position

Phase: 1 of 7 (Tournament Engine) Plan: 0 of 12 in current phase Status: Planning complete — ready to execute Last activity: 2026-03-01 — Phase 1 planned (12 plans, 5 waves, 68 requirements covered)

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: none yet
  • Trend: -

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Init]: Go monorepo, shared internal/, cmd/leaf and cmd/core are the only divergence points
  • [Init]: NATS sync_interval: always required before first deploy (December 2025 Jepsen finding)
  • [Init]: All monetary values int64 cents — never float64 (CI gate test required)
  • [Init]: go-libsql has no tagged releases — pin to commit hash in go.mod
  • [Init]: Netbird reverse proxy is beta — validate player PWA access in Phase 1 before depending on it in Phase 8

Pending Todos

None yet.

Blockers/Concerns

  • [Phase 1]: go-libsql CGO ARM64 cross-compilation must be validated in CI before any downstream features depend on it
  • [Phase 1]: Netbird reverse proxy beta status — test the full QR code → HTTPS → WireGuard → Leaf flow early
  • [Phase 3]: NATS JetStream cross-domain stream mirroring (Leaf → Core) needs integration test before Phase 2 depends on it
  • [Phase 7]: Pi Zero 2W memory must be profiled on actual hardware with all display views before scaling signage

Session Continuity

Last session: 2026-03-01 Stopped at: Phase 1 planning complete (12 plans, 5 waves) — ready to begin execution with Plan A (Wave 1) Resume file: None