1.9 KiB
| status | phase | source | started | updated | |
|---|---|---|---|---|---|
| partial | 03-dashboard-intake-ui |
|
2026-04-10 | 2026-04-10 |
Current Test
[awaiting human testing]
Tests
1. ClickHouse design system visual review
expected: Dashboard + intake match ~/.claude/DESIGN.md — pure black canvas, neon volt accents, Inter Black display typography result: [pending]
2. Mobile responsive layout at 390px
expected: All pages render single-column on mobile; PWA install works on Android result: [pending]
3. Camera QR scanner
expected: Real printed HW-XXXXX QR codes scan correctly and navigate to /item/:id result: [pending]
4. Category/tags/location filters (scope deviation)
expected: Full filter support per ROADMAP SC-2. Currently implemented: catalog_status + text search only. result: [deferred — requires backend Device type extension for category/location/tags] note: Scope expansion — needs decision whether to add in a polish phase or defer to v2
5. Audit history in item detail (scope deviation)
expected: Item detail view shows audit log per ROADMAP SC-3. Currently: photos/specs/ai_notes/test_data only. result: [deferred — requires new backend endpoint for NetBox object-changes API] note: Scope expansion — needs polish phase or defer to v2
6. Intake correction flow (implementation deviation)
expected: ROADMAP SC-4 "allows correction before creating the NetBox record". Currently: record created on POST, review screen is display-only per INTAKE-04 decision. result: [deferred — architecturally conflicts with Phase 2 decision] note: Accept INTAKE-04 decision, or add PATCH endpoint to update name after review
Summary
total: 6 passed: 0 issues: 0 pending: 3 skipped: 0 blocked: 0 deferred: 3
Gaps
Three deferred items are scope deviations accepted during autonomous overnight execution. Human review required to decide:
- Add polish phase to close them
- Defer to v2
- Accept as-is