homelabby/.planning/phases/03-dashboard-intake-ui/03-HUMAN-UAT.md

1.9 KiB

status phase source started updated
partial 03-dashboard-intake-ui
03-VERIFICATION.md
2026-04-10 2026-04-10

Current Test

[awaiting human testing]

Tests

1. ClickHouse design system visual review

expected: Dashboard + intake match ~/.claude/DESIGN.md — pure black canvas, neon volt accents, Inter Black display typography result: [pending]

2. Mobile responsive layout at 390px

expected: All pages render single-column on mobile; PWA install works on Android result: [pending]

3. Camera QR scanner

expected: Real printed HW-XXXXX QR codes scan correctly and navigate to /item/:id result: [pending]

4. Category/tags/location filters (scope deviation)

expected: Full filter support per ROADMAP SC-2. Currently implemented: catalog_status + text search only. result: [deferred — requires backend Device type extension for category/location/tags] note: Scope expansion — needs decision whether to add in a polish phase or defer to v2

5. Audit history in item detail (scope deviation)

expected: Item detail view shows audit log per ROADMAP SC-3. Currently: photos/specs/ai_notes/test_data only. result: [deferred — requires new backend endpoint for NetBox object-changes API] note: Scope expansion — needs polish phase or defer to v2

6. Intake correction flow (implementation deviation)

expected: ROADMAP SC-4 "allows correction before creating the NetBox record". Currently: record created on POST, review screen is display-only per INTAKE-04 decision. result: [deferred — architecturally conflicts with Phase 2 decision] note: Accept INTAKE-04 decision, or add PATCH endpoint to update name after review

Summary

total: 6 passed: 0 issues: 0 pending: 3 skipped: 0 blocked: 0 deferred: 3

Gaps

Three deferred items are scope deviations accepted during autonomous overnight execution. Human review required to decide:

  • Add polish phase to close them
  • Defer to v2
  • Accept as-is