Plan 02-04 Summary: oMLX Integration (Deferred)

Outcome

Deferred to human verification — this plan requires:

  1. oMLX installed on Mac Mini M4 with Gemma 4 model loaded
  2. Live memory measurement during inference
  3. Real photo upload through the intake endpoint

The user explicitly deferred manual verification to morning review. This plan is tracked in HUMAN-UAT.md for the phase.

Tasks

# Task Status
1 oMLX integration test scaffold skipped (requires hardware)
2 Memory budget measurement skipped (requires hardware)

Next Steps (Human Action)

  1. Install oMLX on Mac Mini M4
  2. Pull Gemma 4 E4B model
  3. Run go test ./internal/ai/... -run TestOMLXIntegration -tags=integration
  4. Document peak memory usage in docs/omlx-setup.md

Self-Check: DEFERRED (pending hardware setup)