Archived: - milestones/v1.0-ROADMAP.md - milestones/v1.0-REQUIREMENTS.md - milestones/v1.0-MILESTONE-AUDIT.md Deleted (fresh for next milestone): - ROADMAP.md Updated: - MILESTONES.md (new entry) - PROJECT.md (requirements → Validated, decisions with outcomes) - STATE.md (reset for next milestone) v1.0 MVP shipped: - 6 phases, 16 plans - 2,732 lines Python - All 9 requirements validated Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
142 lines
5.3 KiB
Markdown
142 lines
5.3 KiB
Markdown
---
|
|
milestone: 1.0
|
|
audited: 2026-01-17
|
|
status: passed
|
|
scores:
|
|
requirements: 9/9
|
|
phases: 6/6
|
|
integration: 24/24
|
|
flows: 4/4
|
|
gaps:
|
|
requirements: []
|
|
integration: []
|
|
flows: []
|
|
tech_debt:
|
|
- phase: 01-foundation
|
|
items:
|
|
- "Missing test coverage for error handling paths in database.py (lines 62, 85, 91-93)"
|
|
- phase: 04-single-model-qa
|
|
items:
|
|
- "Error handling enhancement deferred (original roadmap estimated 04-03 plan)"
|
|
- phase: general
|
|
items:
|
|
- "Orphaned export: get_round_messages defined but unused"
|
|
- "Inconsistent pattern: export.py has local get_selected_project instead of importing from projects.py"
|
|
- "Services __init__.py missing re-exports for save_consensus, get_consensus"
|
|
- "Allowed users middleware not enforced (BotConfig.allowed_users defined but unchecked)"
|
|
---
|
|
|
|
# Milestone v1.0 Audit Report
|
|
|
|
## Summary
|
|
|
|
**Status: PASSED**
|
|
|
|
All 9 requirements satisfied. All 6 phases complete. All 4 E2E flows verified. Cross-phase integration verified with 24 exports properly wired.
|
|
|
|
## Requirements Coverage
|
|
|
|
| Requirement | Phase | Status | Evidence |
|
|
|-------------|-------|--------|----------|
|
|
| Project scaffolding | Phase 1 | ✓ Satisfied | pyproject.toml, .pre-commit-config.yaml, src/moai/ structure |
|
|
| M1: /help, /status | Phase 2 | ✓ Satisfied | handlers/commands.py, handlers/status.py |
|
|
| M2: Project CRUD | Phase 3 | ✓ Satisfied | handlers/projects.py with new/select/delete/models/info |
|
|
| M3: Single model Q&A | Phase 4 | ✓ Satisfied | /ask command in handlers/discussion.py |
|
|
| M4: Open mode (parallel) | Phase 5 | ✓ Satisfied | /open command with asyncio.gather |
|
|
| M5: Discuss mode (sequential) | Phase 5 | ✓ Satisfied | /discuss, /next, /stop commands |
|
|
| M6: Consensus generation | Phase 6 | ✓ Satisfied | /consensus command |
|
|
| M7: Export to markdown | Phase 6 | ✓ Satisfied | /export command |
|
|
| M8: @mention direct messages | Phase 5 | ✓ Satisfied | @mention MessageHandler |
|
|
|
|
## Phase Completion
|
|
|
|
| Phase | Plans | Status | SUMMARY.md |
|
|
|-------|-------|--------|------------|
|
|
| 1. Foundation | 3/3 | Complete | ✓ All present |
|
|
| 2. Bot Core | 2/2 | Complete | ✓ All present |
|
|
| 3. Project CRUD | 3/3 | Complete | ✓ All present |
|
|
| 4. Single Model Q&A | 2/2 | Complete | ✓ All present |
|
|
| 5. Multi-Model Discussions | 4/4 | Complete | ✓ All present |
|
|
| 6. Consensus & Export | 2/2 | Complete | ✓ All present |
|
|
|
|
**Total:** 16 plans completed, 16 SUMMARY.md files present
|
|
|
|
## Cross-Phase Integration
|
|
|
|
### Wiring Status
|
|
|
|
| From Phase | Export | Used By | Status |
|
|
|------------|--------|---------|--------|
|
|
| Phase 1 | SQLAlchemy models | services, handlers, orchestrator, exporter | CONNECTED |
|
|
| Phase 1 | database.py functions | main.py, services | CONNECTED |
|
|
| Phase 2 | BotConfig, register_handlers | main.py, ai_client | CONNECTED |
|
|
| Phase 3 | project service functions | handlers | CONNECTED |
|
|
| Phase 3 | get_selected_project | discussion.py, status.py | CONNECTED |
|
|
| Phase 4 | AIClient, MODEL_MAP | main.py, orchestrator, handlers | CONNECTED |
|
|
| Phase 5 | discussion service | handlers, orchestrator | CONNECTED |
|
|
| Phase 5 | orchestrator functions | handlers | CONNECTED |
|
|
| Phase 6 | exporter functions | export handler | CONNECTED |
|
|
| Phase 6 | consensus service | discussion handler | CONNECTED |
|
|
|
|
**Connected:** 24 key exports properly used
|
|
**Orphaned:** 1 (get_round_messages - low severity)
|
|
**Missing:** 0
|
|
|
|
## E2E Flow Verification
|
|
|
|
### Flow 1: Single Model Q&A
|
|
`/project new → /project select → /ask → response`
|
|
|
|
**Status: COMPLETE** - All steps verified functional
|
|
|
|
### Flow 2: Open Mode (Parallel)
|
|
`/project new → /project select → /open → parallel responses`
|
|
|
|
**Status: COMPLETE** - asyncio.gather orchestration verified
|
|
|
|
### Flow 3: Full Discussion Flow
|
|
`/project new → /project select → /discuss → /next → /stop → /consensus → /export`
|
|
|
|
**Status: COMPLETE** - State management via user_data verified, persistence verified
|
|
|
|
### Flow 4: @mention During Discussion
|
|
`@claude message → direct response (with context if discussion active)`
|
|
|
|
**Status: COMPLETE** - MessageHandler regex filter verified, optional context loading verified
|
|
|
|
## Tech Debt Summary
|
|
|
|
### Phase 1: Foundation
|
|
- **Coverage gap:** Error handling paths in database.py untested (lines 62, 85, 91-93)
|
|
- **Severity:** Low - happy path tested, edge cases deferred
|
|
|
|
### Phase 4: Single Model Q&A
|
|
- **Deferred plan:** 04-03 error handling enhancement not implemented
|
|
- **Severity:** Low - basic error handling exists, comprehensive retry/timeout logic deferred
|
|
|
|
### General
|
|
- **Orphaned export:** `get_round_messages` in discussion service defined but unused
|
|
- **Pattern inconsistency:** export.py has local `get_selected_project` sync function vs importing async version
|
|
- **Missing re-exports:** `save_consensus`, `get_consensus` not in services/__init__.py
|
|
- **Feature gap:** `allowed_users` auth middleware not enforced (defined in config but unchecked)
|
|
|
|
### Total Tech Debt: 7 items across 3 categories
|
|
- Critical blockers: 0
|
|
- Non-blocking items: 7
|
|
|
|
## Recommendation
|
|
|
|
**READY TO COMPLETE**
|
|
|
|
Milestone v1.0 has:
|
|
- All 9 requirements satisfied
|
|
- All 6 phases complete with SUMMARY.md files
|
|
- All 4 E2E user flows verified
|
|
- Cross-phase integration fully connected
|
|
- Tech debt documented but non-blocking
|
|
|
|
Proceed with `/gsd:complete-milestone v1.0`
|
|
|
|
---
|
|
*Audited: 2026-01-17*
|
|
*Auditor: gsd-integration-checker*
|