nexus/.planning/STATE.md

2.4 KiB

gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.6 Voice Pipeline + Minimal Message Bridge planning null 2026-04-03 2026-04-03
total_phases completed_phases total_plans completed_plans percent
4 0 0 0 0

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-04-03)

Core value: A fresh onboard asks for ONE thing (root directory), auto-creates PM + Engineer agents, and drops you in the dashboard. Current focus: Phase 36 — Voice Pipeline Foundation (ready to plan)

Current Position

Phase: 36 of 39 (Voice Pipeline Foundation) Plan: — (not started) Status: Ready to plan Last activity: 2026-04-03 — v1.6 roadmap created (4 phases, 23 requirements mapped)

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0 (v1.6)
  • Average duration: -
  • Total execution time: 0 hours

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Key constraints for v1.6:

  • voicePipelineService is the keystone — Phase 37 and Phase 38 both depend on it; build Phase 36 first
  • Telegram bridge uses long polling (grammY bot.start()) — no public HTTPS required on Mac Mini
  • Audio transcoding via ffmpeg-static ^5.2.0 — NOT archived fluent-ffmpeg (archived May 2025)
  • Voice mode flag must survive every pipeline layer: client → Express → message persistence → agent codec
  • COOP/COEP headers required for @ricky0123/vad-react SharedArrayBuffer (add to Express static middleware)
  • Phase 37 and Phase 38 are independent once Phase 36 ships; sequential ordering for single-developer delivery
  • Telegram bridge must stay under 500 lines (TGRAM-06 is a hard constraint)

Pending Todos

None yet.

Blockers/Concerns

  • [v1.5 carryover] smart-whisper Apple Silicon acceleration unverified on Mac Mini M4 — fall back to tiny.en if base.en acceleration not confirmed
  • [v1.6] grammY session management approach not yet chosen: lightweight Map<chatId, sessionId> vs. grammY conversation plugin — decide at Phase 38 planning
  • [v1.6] Dual output prompt reliability on 7B models is ~90% — Approach B fallback (post-process markdown strip) must be implemented as safety net, not optional

Session Continuity

Last session: 2026-04-03 Stopped at: Roadmap created — 4 phases defined, 23/23 requirements mapped Resume file: None